Case Study
A150Rail rectification works at WICET (Wiggins Island Coal export terminal) delivered by GMG.
Problem
GMG were approached by representatives of WICET with a problem, the 1000meter long A150 Rail sections, their newly built and commissioned Gantry Coal Stacker runs along, was cracking. Continue reading “Sometimes the impossible can be done, a case study of the rail rectification works WICET”