A150Rail rectification works at WICET (Wiggins Island Coal export terminal) delivered by GMG.

Sometimes the impossible can be done, a case study of the rail rectification works WICET

Case Study

A150Rail rectification works at WICET (Wiggins Island Coal export terminal) delivered by GMG.

Problem

GMG were approached by representatives of WICET with a problem, the 1000meter long A150 Rail sections, their newly built and commissioned Gantry Coal Stacker runs along, was cracking. Continue reading “Sometimes the impossible can be done, a case study of the rail rectification works WICET”